Our Burnaby multiplex guide lists City development and amenity charges as "per new home; varies." This post fills in that line. Burnaby publishes its rates, and once you know which density category your design falls into, you can put a real number in your budget before you pay for drawings.
The short version: the same lot can carry City charges of about $164,000 or about $338,000 depending on how many homes you build and how they're arranged, and regional charges from Metro Vancouver go up on January 1, 2027.
What you pay the City
Burnaby collects two one-time charges on new homes:
- Development cost charges (DCCs) pay for growth-related roads, water, drainage, sanitary sewer, parks and fire facilities.
- Amenity cost charges (ACCs) pay for growth-related amenities such as community centres, libraries, childcare and public spaces.
Both bylaws were adopted on June 24, 2024 and took effect July 1, 2024. Both are payable when the building permit is issued (or when a subdivision is approved, if you're creating new lots). The current residential rates are:
| Category | DCC | ACC | Total | Charged on |
|---|---|---|---|---|
| Low density | $54,870 | $26,963 | $81,833 | Each primary home (suites free) |
| Medium density | $37,423 | $18,874 | $56,297 | Every home, suites included |
| High density | $25,360 | $13,481 | $38,841 | Every home, suites included |
Which category is your design?
This is where the money is. The City's guide to DCCs and ACCs for small-scale multi-unit housing sorts designs like this:
- Low density: one building with no more than two primary homes. A house, a house with a suite, a duplex, or a duplex with one or two suites. Only the primary homes are charged.
- Medium density: more than one building, or more than two primary homes, where the homes don't share a hallway. This covers most multiplexes: a front and rear building, a triplex, a fourplex, a sixplex, rowhouses, cottage courts and laneway homes. Every home is charged, including suites.
- High density: homes reached through a shared corridor and shared entrance, like a small apartment building. Every home is charged, at the lowest per-home rate.
Worked examples
These are City charges only, before any credit for the house you remove (see below). We multiplied the published rates by the number of homes.
| Design | Category | City DCC + ACC |
|---|---|---|
| Duplex with two suites (4 homes, one building) | Low | 2 × $81,833 = $163,666 |
| House, suite and laneway home (3 homes, two buildings) | Medium | 3 × $56,297 = $168,891 |
| Fourplex, front and rear buildings | Medium | 4 × $56,297 = $225,188 |
| Sixplex, ground-oriented | Medium | 6 × $56,297 = $337,782 |
| Sixplex off a shared corridor | High | 6 × $38,841 = $233,046 |
Two things stand out. First, a duplex with two suites gives you four homes in Burnaby's count (suites count as homes in R1) but pays City charges on only two, about $40,900 a home. A front-and-rear fourplex pays on all four. Second, a sixplex designed around a shared corridor pays about $104,700 less in City charges than the same six homes with their own front doors. That doesn't make the corridor design better. It changes the floor plan, the code requirements and what buyers or renters will pay. But it's a difference worth pricing before the design is fixed, not after.
Credit for the house you take down
Burnaby charges on a net new basis: existing homes removed from the site are credited against the charge. If you're replacing a house with a fourplex, you won't pay on all four homes at the medium rate. The City's guide doesn't publish a worked credit, so ask Development Finance how your existing house and any suite will be counted. The City also publishes a DCC, ACC and school charge fee estimator spreadsheet on its development funding page.
What the City charges don't include
The City also collects charges on behalf of other agencies, and these sit on top of the table above:
- Metro Vancouver regional DCCs for water, liquid waste (sewer) and regional parkland.
- TransLink regional transportation DCCs.
- School site acquisition charges for the Burnaby School District, on all new residential development.
Metro Vancouver's water and sewer charges matter most for timing. The region lowered them for building permits issued on or after July 24, 2026, and they rise again on January 1, 2027:
| Regional charge, per townhouse home | From July 24, 2026 | From January 1, 2027 |
|---|---|---|
| Water | $9,839 | $13,954 |
| Liquid waste, Vancouver Sewerage Area | $9,593 | $10,557 |
| Liquid waste, Fraser Sewerage Area | $10,015 | $11,028 |
On water alone, that's $4,115 more per home, or $24,690 on six homes charged at the townhouse rate. Metro Vancouver has separate rates for a residential lot (detached, duplex and triplex) and for apartments, and the sewer rate depends on which sewerage area your lot is in, so confirm with the City which rate applies to your design. If your permit is close, the date it's issued is worth asking about. If it's months away, budget at the 2027 rates.
Can you get a break?
For a privately owned multiplex, probably not. Burnaby's waivers and reductions bylaw covers affordable housing that meets a provincial definition and not-for-profit student rental housing run for BCIT or SFU. The DCC bylaw also exempts building permits where the work is valued at $50,000 or less and homes of 29 m² or smaller, which won't apply to a typical multiplex.
In June 2026, Ottawa and the Province announced up to $3.2 billion to cut development charges on multi-unit housing by up to 50% in priority communities. Burnaby's June 25 statement said it wasn't yet known which communities qualify, whether "multi-unit" includes small projects, or which charges would be cut, and no timeline had been announced. Don't put that saving in your budget until the rules are published. We'll post an update in our news section when they are.
A budgeting checklist
- Decide the building layout first: one building or two, shared corridor or separate doors. That sets the category.
- Multiply the City rate by the homes charged, then ask Development Finance (604-294-7942) how your existing home is credited.
- Add Metro Vancouver, TransLink and school charges, using the 2027 regional rates unless your permit will issue before January 1.
- Put all of it next to construction. By Design Construction sees $275 to $500 or more per square foot excluding land, plus BC Hydro work (see our post on Hydro upgrade costs) and a 10 to 15% contingency.
- Ask every builder whether their quote includes these charges. Most construction-only quotes don't.
Builders run these same numbers when they decide what to pay for a lot, so charges come off the land value too. If you'd rather know what your lot supports before choosing a path, request a free lot review or read about selling to a builder.
Sources
- City of Burnaby, Development Funding Program (DCC and ACC rates, definitions, regional and school charges, fee estimator)
- City of Burnaby, DCC and ACC for SSMUH developments (density categories, suites, net new unit credit)
- City of Burnaby, Development Cost Charges Bylaw No. 14645 and Amenity Cost Charges Bylaw No. 14646 (consolidated)
- City of Burnaby, DCC and ACC Waivers and Reductions Bylaw No. 14683 (consolidated)
- City of Burnaby, Success of new funding will depend on local input and getting the details right, June 25, 2026
- Metro Vancouver, Regional Water Development Cost Charge and Liquid Waste Development Cost Charges
- By Design Construction cost ranges, as published on our Burnaby multiplex guide
General information, not legal, tax or financial advice. Rules change; confirm anything for your property with the City and qualified professionals.
