Home / New Westminster / Building a multiplex

Building a multiplex in New Westminster

In June 2026 New Westminster pre-zoned about 3,000 lots for up to 4 or 6 homes. No rezoning needed, but every project needs a Development Permit, and servicing can decide whether it pencils.

Rules checked against the City's Infill Housing Program and Zoning Bylaw sections 401 and 402 on October 23, 2026. Costs from By Design Construction, 2026.

RGO-A or RGO-B: how many homes

ZoneHomes allowedLots
RGO-A, Residential Ground-Oriented Infill (4 unit)Up to 41,881
RGO-B, Residential Ground-Oriented Infill (6 unit)Up to 61,127

Allowed forms include houses with suites, duplexes, triplexes, fourplexes, multiplexes and laneway or carriage houses. No more than two homes can be stacked on top of each other. Homes can be rental, strata or a mix. Look up your lot's zone.

How big you can build

New Westminster caps floor area with a floor space ratio (FSR) that rises with the number of homes:

Homes on the lot2345–6
Maximum FSR0.60.70.81.0
Maximum building coverage40%45%45%50%
  • Height 12.0 m to the peak of a pitched roof, or 11.0 m for a flatter roof.
  • Anything above 2 storeys sits 5.0 m back from the rear lot line.
  • 6.1 m between buildings whose front or rear walls face each other.
  • Lots with 4 or more homes need 12 m² of screened garbage and recycling space.

Parking

RGO-B lots don't require off-street parking, except on a short list of streets mapped in the bylaw. RGO-A lots follow the regular rules: outside frequent-transit areas, generally one space for each main home.

The cost nobody mentions: servicing

The City says its pipes and electrical system were built for up to 3 homes per lot. Projects with more than 3 homes that go ahead before the City upgrades a street may have to pay for water, sewer or electrical upgrades themselves. New West runs its own electrical utility, so check capacity early. On collector and arterial roads, duplexes and multiplexes may also have to give up to 3.0 m of land for a lane.

Duplex or multiplex construction, per sq ft$275–$500+ (excluding land)
Contingency10–15% on top of your quote
Servicing and electrical upgradesSite-specific; can be the deciding cost

Approvals, step by step

  1. Check the lot: zone, size, lane, trees, slope, title, heritage status and servicing.
  2. Run the numbers: what a builder would pay for the lot, next to what it costs to build and what the homes could be worth.
  3. Design to the guidelines: the Development Permit is reviewed against the City's ground-oriented infill design guidelines.
  4. Development Permit, then building permit. No rezoning and no public hearing.
  5. Build: typically around two years from first sketch to move-in.

Where the rules are different

  • Queensborough: house lots don't have the new permissions. The City has a provincial extension to May 4, 2029.
  • Queen's Park: the Heritage Conservation Area still applies, and changes need a Heritage Alteration Permit.
  • Near SkyTrain: in Transit-Oriented Development Areas around 22nd Street, New Westminster, Columbia, Sapperton and Braid stations, the City wants lots consolidated for bigger buildings.

Full New Westminster RGO-A and RGO-B guide.

Sources

  • City of New Westminster, Infill Housing Program (adopted June 2026), FAQ and engineering requirements guide
  • City of New Westminster Zoning Bylaw, sections 401 (RGO-A) and 402 (RGO-B), consolidated June 8, 2026
  • City of New Westminster, Small Scale Multi Unit Housing (Queensborough extension)
  • Cost ranges: By Design Construction, 2026 project estimates. Not quotes.

Summary only. Confirm your project with the City's Development Planning Division (604-527-4532).