The Dens-City blog
Plain-English guides on what you can build, what it costs and how to sell in Burnaby and New Westminster, from a real estate team and a builder who do this work.

The B.C. home flipping tax and multiplex projects: when it applies, and when building exempts you
B.C.'s flipping tax can take up to 20% of the profit on a home sold within two years. Building new homes or a suite can exempt you. Here's how it works.

Taxes when you build and sell: principal residence or business income?
Selling your home as-is is usually tax-free. Building a multiplex and selling the units can be business income, plus GST. A plain-English guide to the rules.

How long does a multiplex take, from first sketch to move-in?
A multiplex in Burnaby or New Westminster takes about two years from sketch to move-in. Here are the stages, what sets the pace of each, and where they stall.

Construction-only vs all-in: how to compare multiplex builder quotes
Two multiplex quotes can differ by hundreds of thousands and still cover different work. A line-by-line way to compare builder quotes in Burnaby and New West.

Is a 33-foot lot big enough for a sixplex in Burnaby?
A standard 33 x 122 ft Burnaby lot can legally hold 6 homes near frequent transit. We run the zoning math to show how much space that leaves for each home.

SkyTrain areas in New West: 22nd Street, New Westminster, Columbia, Sapperton and Braid
New Westminster has five SkyTrain Transit-Oriented Areas. What the 2026 OCP change allows, why most lots still need rezoning, and where infill still fits.

Transit-Oriented Areas near Metrotown, Brentwood and Lougheed: assembly or multiplex?
Own a house within 800 m of a Burnaby SkyTrain station? How Transit-Oriented Area tiers work, why rezoning is still needed, and when assembly beats a multiplex.

Selling with plans or permits: when it pays and when it doesn't
Should you get plans or permits before selling your Burnaby or New West lot to a builder? How permits expire, what transfers to a buyer and when it pays.

Partnering with a builder: how land-for-homes deals work in Burnaby and New Westminster
How land-for-homes and joint venture deals with a builder work in B.C.: the main structures, who carries the risk, which rules apply and what to put in writing.
Parking rules for multiplexes in Burnaby and New Westminster: how many spaces you need, if any
Burnaby and New Westminster multiplex parking rules: when no spaces are needed, how many are required elsewhere, EV outlets, tandem stalls and where cars go.
Protected trees and multiplex designs in Burnaby: what the tree bylaw means for your lot
Once you apply to build a Burnaby multiplex, any tree 20 cm or wider is protected. Permits, fees, replacement trees and how a big tree can shape your design.

Why a lane matters: what builders pay for in a multiplex lot
A lane changes how a Burnaby or New West multiplex lot lays out: setbacks, parking, driveways and fire access. What the bylaws say and how builders value it.

Selling to a builder vs listing to families: who pays more for your lot
A builder prices your Burnaby or New West lot by the homes it can hold, a family by the house on it. How to tell which will pay more, and how to sell to both.
Can you strata-title a duplex or fourplex in Burnaby? What can be sold separately
In Burnaby R1, main homes can be strata-titled and sold, but suites can't. When to register the strata plan, what changes at 5 units, and what to plan first.
Infill in Queen's Park: what the Heritage Conservation Area allows
Queen's Park lots got RGO multiplex zoning, but the heritage area still applies. What Protected and Non-protected owners can build, and what to ask first.
Queensborough and the multiplex rules: why it's different until 2029
Queensborough house lots weren't pre-zoned for 4 or 6 homes. Why New Westminster has an extension to May 4, 2029, what you can build now, and what to watch.
Development cost charges on a Burnaby multiplex: what to budget
Burnaby charges DCCs and ACCs per home, and the rate depends on your design. Worked numbers for a duplex, fourplex and sixplex, plus regional fees rising Jan 1.

Who pays for water and sewer upgrades on a New Westminster fourplex
New West pipes were built for 3 homes a lot. How the fire flow map, utility modelling, service connections and stormwater rules decide what infill owners pay.
Why a BC Hydro upgrade can cost $2,000 or $120,000 on a multiplex
What decides the BC Hydro bill on a Burnaby multiplex: express vs design connections, the four-meter trigger, transformers, deposits and New West's own utility.

Laneway home or secondary suite: which pays more on a Burnaby lot?
Burnaby lets you add a suite, a laneway home or both. How the rules differ on size, parking, rentals and title, and a simple way to compare what each pays back.
RGO-A or RGO-B? How to tell which New Westminster infill zone you're in, and why it matters
New Westminster's RGO-A and RGO-B infill zones share most rules. How to check which one your lot is in, and the two differences that change what you build.

4 homes or 6? How Burnaby's Frequent Transit Network Area decides your lot
Two identical Burnaby lots can allow 4 homes or 6. The difference is the Frequent Transit Network Area. What it is, how to check it, and what changes on your lot when you're inside it.
