Our selling to a builder page lists four ways to sell a house lot, and the second is the one owners ask about most: pay for design or permits first, then sell a lot a builder can start on sooner. It sounds like an easy way to add value. Sometimes it does. Sometimes you spend months and real money on work the buyer throws away. Here's how to decide in Burnaby and New Westminster.
What "plans or permits" really means
There are three different things people mean when they say a lot is sold "with permits," and they are worth very different amounts:
- A concept design. A designer shows what fits: number of homes, floor area, parking, trees. No City approval yet.
- An approval in progress or granted. In New Westminster, infill projects need a Development Permit. In Burnaby, a multiplex needs an Engineering pre-application approved before the building permit application goes in.
- An issued building permit. Fees and charges are paid and construction can start.
A builder pays for two things: time saved and risk removed. A concept design saves a little time and removes almost no risk. An approval removes real risk. An issued permit removes the most risk, but in Burnaby it comes with a clock, as you'll see below.
Burnaby: why an issued permit is a ticking clock
Burnaby's process for a multiplex on an R1 lot runs through an Engineering pre-application first. The City says a complete pre-application typically takes about 15 business days to review. Then the building permit application goes in through the online portal, with full fees paid at application.
Three rules matter if you plan to sell with a permit:
- Charges are paid at issuance. Burnaby collects development cost charges and amenity cost charges when the building permit is issued. An issued permit means you have already paid them, along with permit fees and any engineering cash-in-lieu. Our post on Burnaby development cost charges shows how large those can be. You need the buyer to pay you back for all of it in the price.
- Permits expire fast. Under Burnaby's Building Bylaw, a permit expires if work hasn't started within 90 days of issue. The Building Inspector can extend it once, by up to 90 days, but a permit is void if work hasn't started within 180 days. A sale that takes three months to close can eat most of that.
- Expired permits aren't refunded. The bylaw says no refund is payable on an expired permit. A permit can be transferred to a new owner, but only after written notice to the Building Inspector and a fee, and a transfer doesn't extend the expiry.
So selling a Burnaby lot with an issued permit only works if a builder can close and start almost immediately. For most owners, the safer value point is earlier: engineering pre-application done, drawings complete, and the building permit application ready or under review, so the buyer pays the big charges at issuance, not you.
New Westminster: a Development Permit stays with the land
New Westminster works differently. The City says infill housing on RGO-A and RGO-B lots needs no rezoning, but it does need a Development Permit, reviewed against the City's design guidelines for infill.
Under B.C.'s Local Government Act, when a City issues a development permit it files a notice in the land title office, and the permit's terms bind anyone who later acquires an interest in the land. In plain terms, the approval goes with the property when you sell. It also lapses if construction isn't substantially started within 2 years of issue, unless the permit says otherwise. Two years is a much more forgiving window than Burnaby's 90 days for a building permit.
The catch in New West is servicing. The City says existing infrastructure was designed for up to three units, and projects of more than three homes built before the City's own upgrades "will have to undertake all necessary infrastructure upgrades at their cost." Our post on water and sewer upgrades for a New West fourplex explains how to get a read on it early.
The risk nobody puts in the brochure: rules change
Plans are drawn to today's rules. If the rules move, the plans can be worth nothing. On October 16, 2025, for example, Burnaby council cut multiplex heights from 4 storeys to 3 (and 10 metres), capped rear buildings at 2 storeys and reduced achievable floor area by 33 to 60%, depending on the project.
The next change may come from Victoria. B.C.'s incoming premier has said he will repeal the law that allows multiplexes without rezoning; we covered that in our news post on the repeal plan. Nothing has changed yet, and it's unknown how in-progress applications would be treated. Until that's clear, an approval already granted is worth more than one you're about to start.
When it pays, and when it doesn't
| Getting plans or permits tends to pay when | It tends not to pay when |
|---|---|
| The lot is a clear multiplex site: good size, lane, workable trees and slope | The lot has a question mark (a protected tree, slope, a title issue) that a design won't fix |
| You can wait several months to sell and carry the costs | You need to sell soon |
| The approval transfers cleanly and lasts, like a New West Development Permit | The approval expires quickly once issued, like a Burnaby building permit |
| The design is practical for a typical builder's costs | The design reflects your taste, and builders will redraw it to their own plans anyway |
| Rules are stable for the approval you're seeking | A rule change is pending that could strand the drawings |
Talk to builders before you hire a designer. Many have their own standard plans, and Burnaby's SHiFT tool offers standardized designs the City says have been reviewed for its zoning and building rules. If a builder would rather start from a known design, custom drawings add little.
Your money in, and what a builder pays back
The test: will a builder pay more for the approved lot than you spent getting it approved, plus the months you waited? Design, survey, arborist and engineering work all cost money before any City fees. By Design Construction sees construction costs of $275 to $500 or more per square foot excluding land, so a builder's room to pay you a premium is real but limited. And the more development work you do, the more the sale can look like a project rather than selling your home. Ask an accountant about tax before you spend.
The takeaway
In Burnaby, aim to sell with the groundwork done and the building permit not yet issued, so the buyer pays the charges and controls the 90-day clock. In New Westminster, a Development Permit is often the most valuable thing you can add, because it stays with the land and lasts up to two years. If you'd like to know whether your lot is worth the extra step, request a free lot review. We'll tell you what it allows, what a builder would pay as-is, and whether permits would likely add more than they cost.
Sources
- City of Burnaby, New Home Construction (multiplex steps, Engineering pre-application review time, DCCs and ACCs at permit issuance, SHiFT). Checked November 6, 2026
- City of Burnaby, Burnaby Building Bylaw 2016, Bylaw No. 13658, consolidated: s. 4(6) transfers, s. 14 refunds, s. 18 expiry, s. 19 extensions
- City of Burnaby, City Council cuts height and size of new Province-mandated developments, October 16, 2025
- City of New Westminster, Infill Housing Program (Development Permit required, no rezoning, servicing upgrades)
- Province of B.C., Local Government Act, Part 14: s. 503 (notice on title, binding on later owners), s. 504 (lapse after 2 years)
- Dens-City, Burnaby multiplex guide (By Design Construction cost ranges)
General information, not legal, tax or financial advice. Rules change; confirm anything for your property with the City and qualified professionals.